The previous days JC being pulled back to Bardwell to allow
for the CJ to get into Janesville after the rerailment. Belden, IL
Near Hebron, IL(Lange Rd.)
View showing north side of derailment
View showing south side of derailment
Maggio arrives with a crane to assist the rerailing of the 4002
Lifting the 4002
Now that the rear truck of the 4002 is on the rail, the 4007 and
the 4009 are being used to pull the front truck of the 4002 back on the rail.
Cutting a joint bar off before they pull the front truck of the 4002 over it
Once the 4002 is back on, they tackle the covered hopper.
The last axle of the covered hopper goes over the rerailing frog
and the job is finished.
The track after the 4002 and car are rerailed and out of the way.